Falkenhagen Biogas Park

The plant in the district of Prignitz was established in 2007 and went live in 2008. In January 2016, the plant was taken over by Nordmethan. By means of renovation investments totalling about €2 million, Nordmethan re-enabled profitable operation. Among other things, the restructuring measures comprised the replacement of all solid matter input systems and a general overhaul of the six CHP plants. The modernisation measures provided for replacement of all tank roofs and servicing and replacement of the mixer technology if necessary. Moreover, the pumps were replaced, the control technology was modernised, and the three dryers were repaired. In summer 2016, the plant successively went online. In December 2016, the plant reached a total electrical output of 3.3 MW.


Facts & Figures

Start of building: 2007
Commissioning: 2008
Total capacity: 3,3 MW (produced by 6 CHP)
Digester: 6 x
Post Digester: 6 x
Storage tank: 6 x
Substrates: Maize and pig slurry

Production site

Nordmethan Produktion Falkenhagen 1-6 GmbH
Am Kreuzweg 2
GT Rapshagen
16928 Gerdshagen Germany

Postal address:


Nordmethan Produktion Falkenhagen 1-6 GmbH
Maxim-Gorki-Straße 13
39108 Magdeburg

Hinweis 12. BlmSchV